Files
openbitdo/process/wave2_results.md

1020 B

Wave 2 Results

Scope

  • Expansion cohort: 12 additional popularity-first PIDs.
  • Evidence mode: static/decompiler-only.
  • Support result: all 12 moved to candidate-readonly with detect/diag-only behavior.

Delivered

  1. Manual, source-controlled dossier and matrix updates (no script-generated artifacts).
  2. Wave 2 dossier set (core_diag, mode_or_profile_read, firmware_preflight) for each of 12 PIDs.
  3. pid_matrix.csv updated with Wave 2 candidate-readonly tiering.
  4. command_matrix.csv updated with Wave 2 dossier-linked rows and explicit promotion gates.
  5. evidence_index.csv updated from current candidate-readonly set.
  6. Governance verification completed for variables, labels, and required checks.

Deferred

  • Runtime trace evidence for Wave 2 cohort.
  • Hardware read/write/readback confirmation for Wave 2 cohort.
  • Any promotion to full for Wave 2 cohort.

Exit Status

  • Wave 2 static-only deliverables: complete.
  • Promotion status: blocked pending runtime + hardware signals.